View Single Post
  #3  
Old 06-17-2009, 11:36 AM
Avaire Archive Avaire Archive is offline
Archive
 
Join Date: Jun 2009
Posts: 943
Default

Author: Journeyman
Date: 3/16/2008 6:44 pm EDT
All ceramic tile installations (whether floating or rigid installations) would require a perimeter gap for expansion. The Tile Council of North America recommends one leave a 1/4" gap all around the perimeter of the tiled area for this purpose.

Should you then want to caulk that gap with a flexible CAULK I suppose you could but covering the gap with the baseboard or various trims would be the thing to do.
Reply With Quote