Avaire Forum  
  #1  
Old 06-24-2009, 02:44 PM
Avaire Archive Avaire Archive is offline
Archive
 
Join Date: Jun 2009
Posts: 943
Default baseboards

Author: Paula
Date: 5/8/2009 9:48 pm EDT
We have already removed all baseboards in the bathroom. We are ready to tile. Do we put the baseboards back in after tiling all the way to the bottom of the perimeter gap? Or do we place the bottom of the baseboard level with top of tile?
Reply With Quote
  #2  
Old 06-24-2009, 02:44 PM
Avaire Archive Avaire Archive is offline
Archive
 
Join Date: Jun 2009
Posts: 943
Default

Author: chris
Date: 5/11/2009 9:29 am EDT
After the tile is installed just place the baseboards on top of the tile so it covers the 1/4" perimeter joint. Hope this helps.
Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:07 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.

(888) 528-2473 Copyright © 2009 : CoMc, LLC All Rights Reserved. ~ Design by Chip Thompson