![]() |
|
#1
|
|||
|
|||
|
Author: Jim Fremstad
Date: 5/22/2009 2:35 am EDT after I level a few areas to raise the concrete to the level of the cut-back and fill chipped areas, should I but a poly vinyl 6 mill vapor barrier over the entire area so that 1) the tile slips easier during installation, and 2) to keep the floor heat system out of the tarry adhesive? |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
